FirmAdapt

AI systems for manufacturers

The right stock, faster quotes and a clear view of margin on every job.

We use these details to send your video demo. Privacy policy

Prefer to talk it through? Book a call

970+companies scanned with PATH
4AI companies we own and run

Where the time goes in manufacturing

What we hear most often from manufacturers, before anything gets built.

Stock runs out at the worst time

Reordering depends on someone noticing, so lines stop for parts and cash sits in the wrong stock.

Quotes take days

Every quote means pulling costs, routings and margins together by hand.

Margin shows up after the job is done

By the time actual costs are known, it is too late to fix the job that ran over.

Six systems we'd build for manufacturers

Each one is built around the tools you already use, then run by the team that built it.

9:41
Stock
Watched against demand
Steel bar 40mmBelow minimum
Reordered
M8 fasteners3 weeks cover
OK
Powder coat, blackLead time 10 days
Order today

Inventory & Auto-Reordering

Stock levels watched against demand, with reorders placed before a line stops.

Best sellers in stock. Less cash on shelves.

9:41
Quote #2214
Bracket assembly
Quantity200 units✓
Material and routingMild steel, 4 ops✓
Margin28%✓
Lead time3 weeks✓
Send quote

Instant Quote Builder

Quotes built from your costs, routings and margins in minutes rather than days.

Accurate, branded quotes in minutes.

9:41
Jobs
Actual against quoted
Order #4471Setup time over
Over
Order #4468On budget
On track
Order #4460Finished 6% under
Done

Job Profit Dashboard

Actual against quoted on every job while it runs, so overruns are caught in time.

Profit for every job, while it's live.

9:41
Orders
Live on the floor
#4471 BracketsMachining, op 3 of 4
Running
#4468 HousingsPowder coat
Running
#4460 FramesDispatched
Done

Live Job Tracker

Every order's stage visible on one screen, from material in to dispatch.

Every job, every stage, one screen.

9:41
Tenders
Drafted from past bids
Rail components RFQResponse drafted
Review
Defence supplier listCertificates attached
Ready
Council frameworkSubmitted
Sent

Proposal & Bid Writer

Tender and RFQ responses drafted from your past bids, specs and certifications.

First drafts that follow the brief.

9:41
Shop floor helpWork instructions

Torque setting for the M8 bolts on the housing?

25 Nm, from work instruction WI-114, step 6. Use the calibrated driver.

Company Know-How Assistant

Work instructions and procedures answered in plain English on the shop floor.

Ask in plain English. Answers with sources.

Talk it through with the people who'd build it

A free call with the FirmAdapt team. Bring your questions and the tools you use today.

Questions & answers

Will this work with our ERP?

We build around the systems you already run, including the ones with no API. The working session maps them before anything is proposed.

Do you run this on our own data?

Yes. Forecasts, quotes and margins are built on your history, the same way we run planning inside DemandLabs.

Where does our data live?

In your environment, under your controls. We do not warehouse, copy or store client data on our systems.

What does it cost?

Each system is scoped and priced against the manual work it retires. The working session and the PATH report are free.

See how this would work for your plant

Tell us where to send it and we'll record a short video demo for your business.

We use these details to send your video demo. Privacy policy